Leave your details below - we'll call you back
Leave your details below - we'll call you back
Rubo-Konstrukcje Sp. z o. o.
Hutnicza 44 , 81-061 Gdynia,  Poland
Tel. +48 58 679 95 31 fax:+48 58 679 95 34
e-mail: rubo@rubo-konstrukcje.pl

Rubo RK Modular Scaffolding

RUBO offers scaffolding wedge. It is a system of stands and ledgers combined with wedges and grooves.
 
The wedge connection system helped to give the desired shape of the scaffold and thus easier to hard to reach places. All steel components Rubo scaffolding RK were painted a distinctive green color. Today, scaffolding wedge Rubo RK  is produced only galvanized.
 
Our facade scaffolding solution is easy and quick to install and meets all safety requirements specified by Polish standards. Scaffolding Christmas - wedge, a product made of certified components.
Rubo Modular Scaffolding is declared consistent  with the Safety Certificate B / 02/022/08 issued by the Institute of Mechanised Construction and Rock Mining in Warsaw. Welding technology in our production process has been certified by UDT.

 
Basic elements of Rubo modular scaffolding:
Rubo RK Modular Scaffolding






























Specification:
Scaffolding breadth: 650 mm; 950 mm;
Axial field length: 2090 mm, 2525 mm
Scaffolding height without additional static calculations: 24.00 m
Tier height: 2.00 m
Operating load of wooden lateral deck: 1.00 kN/m2
Operating load ofsteel deck: 3.00 kN/m2
The number of tires lined with decks: Possible all
Number of simultaneously weighted platform inside of one field: 1
Usage of scaffolding — elevation: Closed elevation as per PN-EN 12811-1


Rubo ScaffoldingRubo ScaffoldingRubo ScaffoldingRubo ScaffoldingRubo ScaffoldingRubo ScaffoldingRubo ScaffoldingRubo ScaffoldingRubo ScaffoldingRubo ScaffoldingRubo ScaffoldingRubo ScaffoldingRubo ScaffoldingRubo ScaffoldingRubo ScaffoldingRubo ScaffoldingRubo ScaffoldingRubo Scaffolding

News

5 august Nothing about us without us! On 4-6 August 2017 in Gdynia was held a cult triathlon event - Ironmen Gdynia for which we prepared the structures of the stands; tribunes etc. more 27 july Why choose a modular scaffolding Skyer? We invite you to watch a short film presentation about our scaffolding system:     more 11 february Thanks to National Geographic we could watch known polish kick-boxer and celebrity Przemysław Saleta, who was exploring shipyard work in Shipyard “Remontowa” in Gdańsk and he has became a scaffold assembler for one day. Shipyard “Remontowa” more

design & code LemonArt.pl